Construction must comply with the Quality Management Process of the State, Decree 209/2004/ND-CP and relevant guiding circulars and decrees.

Standards and application documents for construction:
Design Profile
TCVN 3890 – 2009: Fire prevention & fighting equipment for houses and works – equipment, arrangement, inspection and maintenance
TCVN 7336 – 2003: Fire protection system – installation requirements.
TCVN 5738 – 2001: Automatic fire alarm system – Technical requirements.
TCVN 2622 – 1995: Fire protection for houses and buildings – Design requirements.
TCVN 6484: Lightning protection for houses and buildings – design requirements.
TCVN 5873:1995._ Steel welds
TCVN 7472:2005._ Welding Hot-melt welded joints in steel
TCVN 5639:1991: Acceptance of installed equipment – Basic principles.

Relevant Vietnamese Construction Standards:
To ensure the Quality Management Process issued by the State on the construction as well as the quantity of materials and the volume of completing the construction work from time to time on the basis of the Contractor’s construction progress submitted to the Owner. The Investment and Project Management Board for a project must carry out the following work orders:

I. Preparation phase::
The contractor coordinates with related parties to monitor the construction progress of related parties to perform related works, meeting the overall progress of the work.
Prepare construction drawings for each job and submit them to the Investor and the Project Management Board for approval.

About materials:

  • All materials must be submitted before being put into the works and must conform to the standards according to the approved bidding or winning documents and design documents. If the type of material is changed, it must be submitted to the Investor and the Design Consultant for consideration and approval before being put into the project.
  • When bringing materials to the construction site for construction, an approval vote will be made. At the same time, provide documents of origin and certification of goods of all types of materials and materials that have been approved; For materials and equipment imported from abroad, they must conform to the technical requirements of the design and have a copy of the CO and CQ certificate.

II. Construction phase at the site :

Based on the construction drawings approved by the investor, then actual construction will be carried out at the site.
The Construction Unit uses approved materials and equipment for construction.

CONSTRUCTION OF FIRE FIGHTING SYSTEM INCLUDES:

1. Construction Normal fire alarm system (Zone):

Before the construction of fire protection, it is necessary to clearly identify the components of the fire alarm system, which usually include:
Smoke detectors, heat detectors, fire detectors, Beam smoke detectors, fire alarm buttons, fire alarm bells, fire alarm lights, central fire alarm cabinets, signal wiring and power cords.
Note: With simple features and low cost, conventional fire alarm systems are only suitable for installation in companies with medium or small area (about a few thousand m2), the number of departments is not much (several dozen rooms). ); installation for small houses, workshops…
The equipment in the fire alarm system is often connected in series with each other and in series with the fire alarm center, so when a fault occurs, the center can only generalize and display the entire area. which the system monitors (but does not indicate the exact location of each detector, each fire location). This limits the processing capacity of supervisors.

 

2. Construction of fire alarm system – address fire prevention:

Components of an addressable fire alarm system include:
Addressable Smoke Detector, Addressable Heat Detector, Addressable Fire Detector, Beam Smoke Detector, Addressable Push Button, Fire Alarm, Fire Alarm Light, Addressable Central Fire Alarm Cabinet, Addressable Modules for normal detectors, module for connecting and controlling peripheral devices, signal wiring and power cord.
The construction of the addressable fire alarm system needs to be in accordance with the design process, during the installation process, always comply with labor safety according to current regulations.
Note: With high technical features, the addressable fire alarm system is used to install in works with large use ground (several tens of thousands of m2), divided into many independent areas, departments in each area. Each device in the system is connected directly to the fire alarm center to help the center receive the signal of fire happening in each area, each location clearly and accurately.
From there, the center can recognize detailed incident information and be displayed on the auxiliary display board to help supervisors handle the problem quickly.

 

 

INSTALLATION PROCESS OF FIRE ALARM SYSTEM

Step 1. Wire all installation locations of detectors and lights to the location where the fire alarm center is located

Step 2. Conduct insulation resistance measurement, continuity measurement for the installed wiring.

Step 3. Installation of equipment (fire detectors, light bells, fire alarm control cabinets…).

Step 4. Conduct a complete system check and test run the device.

In addition, the wireless addressable fire alarm system is applicable to the following works: Factory (under 500m2), high-rise buildings (6-8 floors), hotels, restaurants,…. With high stability, easy maintenance.

3. Construction of fire fighting system – fire protection with water:

Before constructing a water-based fire protection system, it is necessary to clearly determine the products needed for this process, including: Exterior fire extinguishers, indoor fire extinguishers, fire hose reels, fire hydrants, couplings, etc. fire fighting angle valves, piping systems and fire pumps.
Then the company will follow the plan and exactly according to the installation design of the fire protection system handed over to you.

 

 

4. Construction Sprinkler . automatic fire fighting system:

Sprinkler automatic water extinguishing system is one of the most popular fire fighting systems today.

+ The applications of this system are suitable for high-rise buildings, factories, constructions…

+ Not suitable for installation in IT server room areas or products with high damage characteristics when encountering water.

Advantages: Installation is quick, easy and does not cost as much as other specialized fire suppression systems

Materials needed for construction of fire protection system: Sprinkler nozzles, Fire pump system and pipes, fire valves, fire alarm valves (Alarm Valve), fire alarm lights, fire alarm bells

 

5. Construction Fire protection system – foam fire fighting:

Foam extinguishers, piping systems, fire valves, fire alarm systems. This system is mainly used for fire fighting for gas stations
Foam fire extinguishing system is now used quite a lot because it reduces the amount of water needed, reduces the amount of extinguishing agent when extinguishing a fire, reduces environmental pollution, for high expansion foam, most there was no damage to the goods, and in a short time the whole warehouse was back to normal.

Foam fire suppression systems are used in areas with a high risk of fire and explosion, carefully selected, requiring the appropriate provision of foam concentrates, foam mixing systems, foaming devices, and effective coordination between these parts in a fire fighting system.

When activated, the foam fire extinguishing system will spray a foam that covers the surface of gasoline, separating the flammable liquid from the air and fire, thereby extinguishing the fire.

The foam mixing system can be either “balanced pressure” or “inline”.

The foam nozzle can be a sprinkler, spray, nozzle, monitor, foam pourer, or high expantion foam generator, depending on the foam system used.

Principle of fire fighting:

Depending on the type of foam, fire can be extinguished in several ways:

Either use foam to cover the surface of the combustible with a thick layer of foam, extinguish the flame and isolate the fuel from further contact with the air, or cool the fuel by the amount of water contained in the foam. , or a cover that prevents the liquid (fuel) from evaporating and mixing with the air.

 

 

6. Construction FM 200 fire protection and fire fighting system:

Is a clean gas fire extinguishing system, safe for the environment and people, meeting high safety standards. Used for oil and gas industries, medium and high voltage substations. Bank, Treasury, library….
The FM-200 (HFC-227ea) Air Fire Clean Gas Fire Extinguishing System is manufactured to ISO9000 quality standards and is UL Listed certified.
The Air Fire FM-200 is a fire extinguishing system designed for operating pressures of 25 bar and 42 bar.
Air Fire’s FM-200 fire extinguishing system is designed with many sizes of extinguishers to suit each area that needs to be extinguished. The system uses containers with a capacity of 13 / 26 / 40 / 67 / 75 / 120 / 240 liters.

Application:This system is suitable for applications in clean environments, where people work, and equipped with machines or high-value data.
– Central computer room
– Electrical, electronic, telecommunications equipment, storage equipment
– Warehouse of high-value goods, treasury
– Art galleries, museums
– Laboratory, medical equipment room
– Petrochemical plants, offshore oil and gas stations, oil and gas pumping stations

Advantages:
– Fast- Effective: spray discharge 30 seconds immediately after receiving the fire alarm signal from the central control cabinet
Safety: FM-200 is certified non-toxic, harmless to humans, does not affect the environment, does not conduct electricity, does not damage electronic equipment.
– Savings: Does not affect equipment in the fire area, reducing treatment costs after the fire

 

7. Construction of wall fire fighting system:

Concept:

The wall fire fighting system is a non-automatic fire fighting system, including: Water pump – one-way, two-way valves – pressure relief valve – overpressure protection valve – hand valve – wall fire cabinet – hose water hose (also known as water cannon), when a fire occurs, the firefighter runs to the fire cabinets located in or hung on the wall (inside containing the water hose is stacked or rolled up). ) quickly roll or pull the hose close to the fire site. then install the nozzle on the end of the wire, the other end is attached to the shaft located in the cabinet. One person holds the hose tightly, the other opens the water supply valve at the cabinet to spray water on the fire.

 

Working principle:

The system using water for fire fighting includes a water supply pipeline system linked to a fire pump (Fire pump), a fire hydrant (Hosereel) and a fire hydrant (Fire Hydrant). When a fire occurs, the user will put the fire hose directly on the fire to extinguish.

The process of installing a wall fire suppression system includes the following steps:

– Step 1: Design and complete the wall fire fighting system.
– Step 2: proceed to submit documents, suppliers and products.
– Step 3: submit samples of materials.
Step 4: Submit construction drawings.
Step 5: Prepare manpower.
Step 6: Prepare construction equipment
– Step 7: deploy the construction.

8. Construction of fire protection system with CO2 gas:

Features of CO2 gas:
CO2 is a colorless, odorless, non-conductive gas, and is a highly effective fire extinguishing agent. Automatic CO2 fire suppression systems are smart, reliable, and control fires quickly before property damage occurs. The characteristic of CO2 gas is that it spreads very quickly, so the ability to extinguish fire is effective

Sequence of FIRE Activation:
– There is a fire:
* Smoke/heat sensor activates fire alarm (1)
* The control cabinet receives the fire alarm signal transmitted from the detector (2)
* The control cabinet transmits a fire alarm signal that emits a bell / whistle / light, and at the same time activates the gas fire extinguisher valve
* Fire alarm activates ringing, gas spray indicator light is on
* CO2 extinguishing gas sprays out from the gas tank, follows the gas pipeline (3), then sprays and spreads through the air nozzle installed in the fire area
* The fire will be extinguished

 

 

 

9. Fire fighting with portable powder or gas extinguishers:

Types of fire extinguisher types BC, ABC, CO2, MFZ4, MFZ8, MFZ32, MT3, MT5, MT32, trolley fire extinguisher, mini fire extinguisher for motorcycles, fire extinguisher for cars.

 

Some pictures of construction of Fire Protection System


 

The construction of fire protection systems for works is an urgent matter according to the provisions of law. Construction of a fire protection system not only ensures the safety of life for themselves and the community, but also creates confidence in the safety of the construction work.

Please contact us, Viet Nhat Company we will bring safety to you.